This Lite-Quote has expired.

Lite-Quote

From:

Ph: (404) 566-1487
E: litesmithatlanta@gmail.com

Lite-Quote Number QUO-31
Lite-Quote Date October 22, 2023
Valid Until October 23, 2023
Total $376.00
To:
James Patkim

2740 Vining Oak Dr SE
Atlanta GA. 30339

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Survey (conducted on 10/19/23)

Survey Objective
In facilities experiencing equipment problems that appear to be power related, on-site surveys generally are required in order to verify that power disturbances are the cause of electronic equipment malfunction or failure. The specific objectives of such a survey, listed in order of priority, follow:
• Determine condition and adequacy of the wiring and grounding system
• Determine ac voltage quality at the point of use
• Determine sources of power disturbances and their impacts of power disturbances on equipment performance
• Analyze findings to identify immediate and long-term cost-effective solutions

$100.000%$100.00
2 Switch installation / Correction

Correctly re-wiring two single pole light switches.I determined the condition was inadequate for the wiring and grounding system. Installation may require new switch devices due to defective existing switches.

$138.000.00%$276.00
Sub Total $376.00
Tax $0.00
Total $376.00